DatasetsTransmission of electricity between Finland and Estonia - power measured every 15 minutes
Measured electrical transmission (power) between Finland and Estonia HVDC tie lines (Estlink 1 and Estlink 2). Positive sign means transmission from Finland to Estonia. Negative sign means transmission from Estonia to Finland. The value is updated once every 15 minutes after the hour shift. The data before 13.06.2023 is in hourly resolution.
Download dataset
You can perform searches on the data and save the results for further processing in the following formats: JSON, CSV, XLSX, XML
Download datasetsAPI
You can download datasets through our open RESTful API. The API enables service development based on the data.
Dataset
Unit | MWh/h |
Data period | 15 min |
Dataset ID | 55 |
Status | Active |
Valid from | 1.1.1900 |
Additional information
Contact persons | Pentti.Saynatjoki@fingrid.fi |
Organization | Fingrid |
License | |
Keywords | Estonia, EE, Measured electrical transmission |
Content groups | Cross-border transmission |
