Skip to main content

DatasetsTransmission capacity FI-RUS

The total commercial transmission capacity of the 400 kV transmission lines from Finland to Russia owned by Fingrid. The technical capacity on 400 kV lines from Russia to Finland is 1400 MW or 1000 MW, depending whether the NWPP power plant that is located in St. Petersburg area is connected to the Finnish or the Russian power system. Fingrid has reserved 100 MW of transmission capacity from Russia to Finland to buy reserve power. The technical maximum capacity from Finland to Russia is 350 MW, of which Fingrid has reserved 30 MW to buy reserve power.

Download dataset

You can perform searches on the data and save the results for further processing in the following formats: JSON, CSV, XLSX, XML

Download datasets

API

You can download datasets through our open RESTful API. The API enables service development based on the data.

Dataset

Unit

MW

Data period

1 h

Dataset ID

103

Status

Active

Valid from

30.11.2014

Additional information

Contact persons

Jussi Huttunen, Tuomo Mäkihannu (firstname.lastname@fingrid.fi)

Organization

Fingrid

License

Keywords

Total capacity, Russia, RUS, FI-RUS, Transmission capacity, Total transmission capacity

Content groups

Cross-border transmission

Example data

Format