135 datasets found

Formats: CSV JSON

Filter Results
  • Wind power production - real time data

    Wind power production based on the real-time measurements in Fingrid's operation control system. About a tenth of the production capacity is estimated as measurements aren't available. The data is updated every 3 minutes.

  • Wind power generation - hourly data

    Finnish hourly wind power generation is a sum of measurements from wind parks supplied to Fingrid and of the estimate Fingrid makes from non-measured wind parks. Non-measured wind parks are about a tenth of the production capacity.

  • Emission factor of electricity production in Finland - real time data

    Near in real time calculated carbon dioxide emission estimate of electricity production in Finland. The emissions are estimated by summing each product of different electricity production type and their emission factor together, and by dividing the sum by Finland's total electricity production.

    The data is updated every 3 minutes.

  • Imbalance power between Finland and Sweden

    The volume of power equals to the difference between measured and commercial transmission between Finland and Sweden. The tradetypes of commercial flow include day ahead, intraday and trades between Fingrid and Svenska Kraftnät during the operational hour. When the value of imbalance power volume is positive Fingrid has sold imbalance power to Sweden. When the value of imbalance power volume is negative Fingrid has bought imbalance power from Sweden.

  • Balancing Capacity Market results

    The amount of capacity procured from the balancing capacity market, MW/week. Fingrid procures mFRR capacity throught the balancing capacity market on a weekly auction, which is held when needed. Balance service provider pledges itself to leave regulating bids on the regulation market. For that the balance service provider is entitled to capacity payment. The procured amount is published at latest on Friday on the week before the procurement week at 12:00 (EET)

  • Hour change regulation, down-regulation

    In order to reduce problems encountered at the turn of the hour in the Nordic countries or in Finland, the planned production changes will be transfered to begin 15 minutes before or after the planned moment.

  • The sales price of production imbalance electricity

    The up-regulating price of the hour is the price of production imbalance power sold by Fingrid to a balance responsible party. If no up regulation has been made or if the hour has been defined as a down-regulation hour, the day ahead spot price of Finland is used as the selling price of production imbalance power. Prices are updated hourly.

  • Power system state - real time data

    Different states of the power system - traffic lights: 1=green, 2=yellow, 3=red, 4=black, 5=blue

    • Green: Power system is in normal secure state.
    • Yellow: Power system is in endangered state. The adequacy of the electricity is endangered or the power system doesn't fulfill the security standards.
    • Red: Power system is in disturbed state. Load shedding has happened in order to keep the adequacy and security of the power system or there is a remarkable risk to a wide black out.
    • Black: An extremely serious disturbance or a wide black out in Finland.
    • Blue: The network is being restored after an extremely serious disturbance or a wide blackout.

    The data is updated every 3 minutes.

  • Other power transactions, up-regulation

    Other power transactions which are necessary in view of the power system.

  • Other power transactions, down-regulation

    Other power transactions which are necessary in view of the power system.

  • Hour change regulation, up-regulation

    In order to reduce problems encountered at the turn of the hour in the Nordic countries or in Finland, the planned production changes will be transfered to begin 15 minutes before or after the planned moment.

  • Frequency containment reserves for disturbances, hourly market prices

    Hourly prices (€/MW,h) of procured frequency containment reserve for disturbances (FCR-D) in Finnish hourly market for each CET-timezone day is published previous evening at 22:45 (EET).

    FCR-D is the frequency containment reserve used in the Nordic synchronous system that aims to keep the frequency above 49,5 Hz during disturbances.

    Hourly market is a reserve market operated by Fingrid. Procured volumes vary for each hour and price is the price of the most expensive procured bid.

  • Frequency containment reserve for disturbances, procured volumes in hourly ma...

    Hourly volume of procured frequency containment reserve for disturbances (FCR-D) in Finnish hourly market for each CET-timezone day is published previous evening at 22:45 (EET).

    FCR-D is the frequency containment reserve used in the Nordic synchronous system that aims to keep the frequency above 49,5 Hz during disturbances.

    Hourly market is a reserve market operated by Fingrid. Procured volumes vary for each hour and price is the price of the most expensive procured bid.

  • Cross-border transmission fee, import from Russia

    Hourly cross-border transmission fee (dynamic tariff) for imports from Russia on Fingrid's connections.

  • Cross-border transmission fee, export to Russia

    Hourly cross-border transmission fee (dynamic tariff) for exports to Russia on Fingrid's connections.

You can also access this registry using the API (see API Docs).