129 datasets found

Formats: CSV JSON

Filter Results
  • Frequency containment reserves for normal operation, procured volumes in hour...

    Hourly volume of procured frequency containment reserve for normal operation (FCR-N) in Finnish hourly market for each CET-timezone day is published previous evening at 22:45 (EET).

    FCR-N is the frequency containment reserve used in the Nordic synchronous system that aims to keep the frequency in normal frequency range between 49,9 - 50,1 Hz.

    Hourly market is a reserve market operated by Fingrid. Procured volumes vary for each hour and price is the price of the most expensive procured bid.

  • Measured electrical transmission between Finland and Åland

    Measured electrical transmission between Finland and Åland islands DC tie line. Positive sign means transmission from Finland to Åland. Negative sign means transmission from Åland to Finland.

    The value is updated once a day before noon with the values of the previous day.

  • Measured electrical transmission between Finland and Central Sweden

    Measured electrical transmission between Finland and Central Sweden (SE3) high voltage direct current tie lines. Positive sign means transmission from Finland to Central Sweden (SE3). Negative sign means transmission from Central Sweden (SE3) to Finland.

    The value is updated once every hour after the hour shift. Each day before noon the values of the previous day are updated with more accurate measurement values.

  • Measured electrical transmission between Finland and Estonia

    Measured electrical transmission between Finland and Estonia HVDC tile lines (Estlink 1 and Estlink 2). Positive sign means transmission from Finland to Estonia. Negative sign means transmission from Estonia to Finland.

    The value is updated once every hour after the hour shift. Each day before noon the values of the previous day are updated with more accurate measurement values.

  • Measured transmission of electiricity between Finland and Northern Sweden

    Measured transmission of electricity between Finland and Northern Sweden (SE1). Positive sign means transmission from Finland to Northern Sweden (SE1). Negative sign means transmission from Northern Sweden (SE1) to Finland.

    The value is updated once every hour after the hour shift. Each day before noon the values of the previous day are updated with more accurate measurement values.

  • Measured transmission of electricity between Finland and Russia

    Measured electrical transmission between Finland and Russia. Positive sign means transmission from Finland to Russia. Negative sign means transmission from Russia to Finland.

    The value is updated once every hour after the hour shift. Each day before noon the values of the previous day are updated with more accurate measurement values.

  • Measured electrical transmission between Finland and Norway

    Measured electrical transmission between Finland and Norway 220kV tie line. Positive sign means transmission from Finland to Norway. Negative sign means transmission from Norway to Finland.

    The value is updated once every hour after the hour shift. Each day before noon the values of the previous day are updated with more accurate measurement values.

  • Production surplus/deficit in Finland - Real time data

    Information is based on the real time measurements in Fingrid's power control system.

    Power deficit/surplus represents the balance between power production and consumption in Finland, taking into account imports and exports. Power deficit/surplus is calculated as the difference between the measured net import/export and the confirmed net exchange program between Finland and the other Nordic countries.

    Sign convention: production deficit -, surplus +

    The data is updated every 3 minutes.

  • Surplus/deficit, cumulative - real time data

    Information is based on the real time measurements in Fingrid's power control system.

    Power deficit/surplus represents the balance between production and consumption in Finland, taking into account imports and exports. It is calculated as the difference between the measured net import/export and the confirmed net exchange program between Finland and the other Nordic countries. The cumulative production deficit/surplus is the hourly energy generated from the difference.

    Sign convention: production deficit -, surplus +

    The data is updated every 3 minutes.

  • Condensing power production - real time data

    Condensing power production based on the real-time measurements in Fingrid's operation control system. The data is updated every 3 minutes.

    Publishing this data has been stopped since 14.9.2017 due to changes in division of power plants. The production data is included in other real time production measurement time series.

  • Transmission between Finland and Central Sweden - real time data

    Power transmission between Central Sweden (SE3) and Finland (FI) HVDC tie lines. Data is based on the real-time measurements in Fingrid's operation control system. Positive sign means transmission from Finland to Central Sweden (SE3). Negative sign means transmission from Central Sweden (SE3) to Finland. The data is updated every 3 minutes.

  • Transmission between Finland and Estonia - real time data

    Power transmission between Finland and Estonia HVDC tie lines (Estlink 1 and Estlink 2). Data is based on the real-time measurements in Fingrid's operation control system. Positive sign means transmission from Finland to Estonia. Negative sign means transmission from Estonia to Finland. The data is updated every 3 minutes.

  • Transmission between Finland and Northern Sweden - real time data

    Power transmission between Northern Sweden (SE1) and Finland (FI) 400kV AC tie line. Data is based on the real-time measurements in Fingrid's operation control system. Positive sign means transmission from Finland to Northern Sweden (SE1). Negative sign means transmission from Northern Sweden (SE1) to Finland. The data is updated every 3 minutes.

  • Transmission between Finland and Norway - real time data

    Power transmission between Finland and Norway 220kV AC tie line. Data is based on the real-time measurements in Fingrid's operation control system. Positive sign means transmission from Finland to Norway. Negative sign means transmission from Norway to Finland. The data is updated every 3 minutes.

  • Transmission between Finland and Russia - real time data

    Power transmission between Finland and Russia based on the real-time measurements in Fingrid's operation control system. Positive sign means transmission from Finland to Russia. Negative sign means transmission from Russia to Finland. The data is updated every 3 minutes.

  • Transmission between Sweden and Åland - real time data

    Power transmission between Åland and Sweden based on the real-time measurements in Fingrid's operation control system. Åland is a part of SE3 (Central-Sweden) bidding zone. Positive sign means transmission from Åland to Sweden. Negative sign means transmission from Sweden to Åland. The data is updated every 3 minutes.

  • Nuclear power production - real time data

    Nuclear power production in Finland based on the real-time measurements in Fingrid's operation control system. The data is updated every 3 minutes.

    Due to the fire on our Olkiluoto substation the total amount of nuclear power measurement has been incorrect between 18 July at 09:00 to 20 July at 13:00. Data corrected 25.1.2019.

  • Other production inc. estimated small-scale production and reserve power plan...

    Reserve power plants electrical production is based on the real-time measurements in Fingrid's operation control system. Estimated small-scale production is added, of which there are no measurements available. The data is updated every 3 minutes.

  • Cogeneration of district heating - real time data

    Cogeneration of district heating based on the real-time measurements in Fingrid's operation control system. The data is updated every 3 minutes.

    Cogeneration means power plants that produce both electricity and district heating or process steam (combined heat and power, CHP).

  • Electricity consumption in Finland - real time data

    Electricity consumption in Finland is calculated based on production and import/export. The data is updated every 3 minutes.

    Production information and import/export are based on the real-time measurements in Fingrid's operation control system.

You can also access this registry using the API (see API Docs).