94 datasets found for "p1"

Formats: CSV JSON

Filter Results
  • Measured transmission of electricity in Finland from north to south

    Measured electricity flow in North-South cut in Finland (cut P1). In the graph flow from North to South is positive.

  • Planned weekly capacity from south to north

    Planned weekly capacity on North-South cut in Finland (cut P1) from South to North. Planned outages are included in the weekly capacity, information is not updated after disturbances.

  • Planned weekly capacity from north to south

    Planned weekly capacity on North-South cut in Finland (cut P1) from North to South. Planned outages are included in the weekly capacity, information is not updated after disturbances.

  • Intraday transmission capacity FI - SE1

    Transmission capacity for intraday market from Finland to Northern Sweden (FI - SE1). For intraday market capacity is given as free capacity after dayahead market. Capacity is published once a day and not updated.

  • Intraday transmission capacity SE1-FI

    Transmission capacity for intraday market from Northern Sweden to Finland (SE1-FI). For intraday market capacity is given as free capacity after dayahead market. Capacity is published once a day and not updated.

  • Transmission of electricity between Finland and Northern Sweden - measured ho...

    Measured transmission of electricity between Finland and Northern Sweden (SE1). Positive sign means transmission from Finland to Northern Sweden (SE1). Negative sign means transmission from Northern Sweden (SE1) to Finland.

    The value is updated once every hour after the hour shift. Each day before noon the values of the previous day are updated with more accurate measurement values.

  • Commercial transmission of electricity between FI-SE1

    Commercial transmission of electricity (dayahead market and intraday market) between Finland (FI) and Northern Sweden (SE1). Positive sign is export from Finland to Sweden.

  • Transmission between Finland and Northern Sweden - real time data

    Power transmission between Northern Sweden (SE1) and Finland (FI) 400kV AC tie line. Data is based on the real-time measurements in Fingrid's operation control system. Positive sign means transmission from Finland to Northern Sweden (SE1). Negative sign means transmission from Northern Sweden (SE1) to Finland. The data is updated every 3 minutes.

  • Day-ahead transmission capacity SE1-FI – official

    Day-ahead transmission capacity from North-Sweden (SE1) to Finland (FI). Transmission capacity is given hourly for every hour of the next day. Each hour is given one value. Day-ahead transmission capacity Fingrid will publish every day in the afternoon. This capacity will not changed after publication. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Day-ahead transmission capacity FI-SE1 – official

    Day-ahead transmission capacity from Finland (FI) to North-Sweden (SE1). Transmission capacity is given hourly for every hour of the next day. Each hour is given one value. Day-ahead transmission capacity Fingrid will publish every day in the afternoon. This capacity will not changed after publication. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Day-ahead transmission capacity FI-SE1 – planned

    Planned day-ahead transmission capacity from Finland (FI) to North-Sweden (SE1). Transmission capacity is given hourly for every next week hour. Each week's hour is given one value. Planned weekly transmission capacity Fingrid will publish every Tuesday. Information will be updated if there are changes to the previous plan timetable or capacity. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Day-ahead transmission capacity SE1-FI – planned

    Planned day-ahead transmission capacity from North-Sweden (SE1) to Finland (FI). Transmission capacity is given hourly for every next week hour. Each week's hour is given one value. Planned weekly transmission capacity Fingrid will publish every Tuesday. Information will be updated if there are changes to the previous plan timetable or capacity. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Kinetic energy of the Nordic power system - real time data

    Real-time estimate of the kinetic energy of the Nordic power system calculated by the Nordic transmission system operators.

    The data is updated every 1 minute.

    Historical data as of 2015/3/27 available.

    More information can be found on Fingrid's internet-site.

  • Transmission of electricity between Finland and Estonia - measured hourly data

    Measured electrical transmission between Finland and Estonia HVDC tile lines (Estlink 1 and Estlink 2). Positive sign means transmission from Finland to Estonia. Negative sign means transmission from Estonia to Finland.

    The value is updated once every hour after the hour shift. Each day before noon the values of the previous day are updated with more accurate measurement values.

  • Congestion income between FI-SE1

    Congestion income between Finland (FI) and Northern Sweden (SE1).

    Congestion income is published on ENTSO-E's Transparency Platform, which can be founded here: https://transparency.entsoe.eu/transmission/r2/dailyImplicitAllocationsCongestionIncome/show . There are historical values to be found from Open Data until the beginning of February 2017. After February 2017 updated data as well as historical data can be founded from ENTSO-E's Transparency Platform.

    Congestion income is calculated as follows: congestion income [€/h] = commercial flow on day ahead market [MW] * area price difference [€/MWh]

    Congestion originates in the situation where transmission capacity between bidding zones is not sufficient to fulfill the market demand and the congestion splits the bidding zones into separate price areas. Congestion income arises from the different prices that the sellers receive and the buyers pay when electricity flows from the higher price area to the lower price area. The seller acting in a lower price area receives lower price for electricity compared to the price the other party pays for electricity in the higher price area, and the power exchange receives surplus income, which it then pays to the Transmission System Operators (TSOs). The TSOs spend the received congestion income on increasing the transmission capacity on its cross-border interconnectors according to the EU regulation.

  • Transmission between Finland and Estonia - real time data

    Power transmission between Finland and Estonia HVDC tie lines (Estlink 1 and Estlink 2). Data is based on the real-time measurements in Fingrid's operation control system. Positive sign means transmission from Finland to Estonia. Negative sign means transmission from Estonia to Finland. The data is updated every 3 minutes.

  • Bilateral trade between FI-RUS

    Bilateral trade between Finland and Russia. Fingrid and the Russian parties confirm the bilateral trades on 400 kV cross-border connection in the morning of the commercial day D for the following commercial day D+1. The confirmed bilateral trades will be bid price-independently on the electricity spot market

  • Day-ahead transmission capacity FI-SE3 – planned

    Planned day-ahead transmission capacity from Finland (FI) to Central-Sweden (SE3). Transmission capacity is given hourly for every next week hour. Each week's hour is given one value. Planned weekly transmission capacity Fingrid will publish every Tuesday. Information will be updated if there are changes to the previous plan timetable or capacity. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Nuclear power production - real time data

    Nuclear power production in Finland based on the real-time measurements in Fingrid's operation control system. The data is updated every 3 minutes.

    Due to the fire on our Olkiluoto substation the total amount of nuclear power measurement has been incorrect between 18 July at 09:00 to 20 July at 13:00. Data corrected 25.1.2019.

  • Transmission of electricity between Finland and Åland - measured hourly data

    Measured electrical transmission between Finland and Åland islands DC tie line. Positive sign means transmission from Finland to Åland. Negative sign means transmission from Åland to Finland.

    The value is updated once a day before noon with the values of the previous day.

You can also access this registry using the API (see API Docs).