43 datasets found

Organizations: Fingrid Groups: Rajakapasiteetit ja siirrot

Filter Results
  • Commercial electricity flow between Finland and Estonia (FI-EE)

    Commercial electricity flow (dayahead market and intraday market) between Finland and Estonia (FI-EE) including system supportive trade between TSOs. Positive sign is export from Finland to Estonia.

  • Exchange trade between Finland and Russia

    Direct trade volumes derive from freely placed bids in the Nordic day-ahead (Elspot) and intra-day (Elbas) electricity markets. Information is updated once the day-ahead market results are public. Information on the intra-day trade is updated before the operational hour

  • Measured transmission of electricity between Finland and Russia

    Measured electrical transmission between Finland and Russia. Positive sign means transmission from Finland to Russia. Negative sign means transmission from Russia to Finland.

    The value is updated once every hour after the hour shift. Each day before noon the values of the previous day are updated with more accurate measurement values.

  • Unused bilateral trade capacity FI-RUS

    Unused bilateral trade capacity from Finland (FI) to Russia (RUS). The capacity of electricity transmission in bilateral trade can be used if the parties do not export the maximum amount of electricity to Russia.

  • Day-ahead transmission capacity SE3-FI

    Day-ahead transmission capacity from Central-Sweden (SE3) to Finland (FI). Transmission capacity is given hourly for every hour of the next day. Each hour is given one value. Day-ahead transmission capacity Fingrid will publish every day in the afternoon. This capacity will not changed after publication. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Day-ahead transmission capacity FI-SE3

    Day-ahead transmission capacity from Finland (FI) to Central-Sweden (SE3). Transmission capacity is given hourly for every hour of the next day. Each hour is given one value. Day-ahead transmission capacity Fingrid will publish every day in the afternoon. This capacity will not changed after publication. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Day-ahead transmission capacity FI-SE1

    Day-ahead transmission capacity from Finland (FI) to North-Sweden (SE1). Transmission capacity is given hourly for every hour of the next day. Each hour is given one value. Day-ahead transmission capacity Fingrid will publish every day in the afternoon. This capacity will not changed after publication. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Unused bilateral trade capacity RUS-FI

    Unused bilateral trade capacity From Russia (RUS) to Finland (FI). The capacity of electricity transmission in bilateral trade can be used if the parties do not import the maximum amount of electricity to Finland.

  • Transmission capacity for intraday market from Mid Sweden and Finland (SE3-FI)

    Transmission capacity for intraday market from Mid Sweden to Finland (SE3-FI). For intraday market capacity is given as free capacity after dayahead market. Capacity is published once a day and not updated.

  • Transmission capacity for intraday market from Northern Sweden to Finland (SE...

    Transmission capacity for intraday market from Northern Sweden to Finland (SE1-FI). For intraday market capacity is given as free capacity after dayahead market. Capacity is published once a day and not updated.

  • Transmission capacity for intraday market from Finland to Mid Sweden (FI - SE3)

    Transmission capacity for intraday market from Finland to Mid Sweden (FI - SE3). For intraday market capacity is given as free capacity after dayahead market. Capacity is published once a day and not updated.

  • Transmission capacity for intraday market from Finland to Northern Sweden (FI...

    Transmission capacity for intraday market from Finland to Northern Sweden (FI - SE1). For intraday market capacity is given as free capacity after dayahead market. Capacity is published once a day and not updated.

  • Transmission capacity to be given to intraday market EE-FI

    Transmission capacity to be given to intraday market EE - FI

  • Transmission capacity RUS-FI

    The total commercial transmission capacity of the 400 kV transmission lines from Russia to Finland owned by Fingrid. The technical capacity on 400 kV lines from Russia to Finland is 1400 MW or 1000 MW, depending whether the NWPP power plant that is located in St. Petersburg area is connected to the Finnish or the Russian power system. Fingrid has reserved 100 MW of transmission capacity from Russia to Finland to buy reserve power. The technical maximum capacity from Finland to Russia is 350 MW, of which Fingrid has reserved 30 MW to buy reserve power.

  • Planned day-ahead transmission capacity FI-SE3

    Planned day-ahead transmission capacity from Finland (FI) to Central-Sweden (SE3). Transmission capacity is given hourly for every next week hour. Each week's hour is given one value. Planned weekly transmission capacity Fingrid will publish every Tuesday. Information will be updated if there are changes to the previous plan timetable or capacity. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Transmission capacity FI-RUS

    The total commercial transmission capacity of the 400 kV transmission lines from Finland to Russia owned by Fingrid. The technical capacity on 400 kV lines from Russia to Finland is 1400 MW or 1000 MW, depending whether the NWPP power plant that is located in St. Petersburg area is connected to the Finnish or the Russian power system. Fingrid has reserved 100 MW of transmission capacity from Russia to Finland to buy reserve power. The technical maximum capacity from Finland to Russia is 350 MW, of which Fingrid has reserved 30 MW to buy reserve power.

  • Stock exchange capacity RUS-FI

    The capacity on the 400 kV connection from Russia to Finland is reserved to direct trade of the following commercial day. Fingrid and the Russian parties, who have jointly agreed that the capacity is 140 MW in both directions, daily confirm the capacity.

  • Stock exchange capacity FI-RUS

    The capacity on the 400 kV connection from Finland to Russia is reserved to direct trade of the following commercial day. Fingrid and the Russian parties, who have jointly agreed that the capacity is 140 MW in both directions, daily confirm the capacity.

  • Real time transmission capacity available for the intraday market FI-EE

    Transmission capacity to be given to intraday market FI-EE. After Elspot trades have been closed, real time intraday capacity is equivalent to the allocated intraday capacity. The real time capacity is updated after each intraday trade so that it corresponds to real time situation.

  • Real time intraday transmission capacity EE-FI

    Transmission capacity to be given to intraday market EE-FI. After Elspot trades have been closed, real time intraday capacity is equivalent to the allocated intraday capacity. The real time capacity is updated after each intraday trade so that it corresponds to real time situation.

You can also access this registry using the API (see API Docs).