Transmission between Finland and Central Sweden - real time data

Power transmission between Central Sweden (SE3) and Finland (FI) HVDC tie lines. Data is based on the real-time measurements in Fingrid's operation control system. Positive sign means transmission from Finland to Central Sweden (SE3). Negative sign means transmission from Central Sweden (SE3) to Finland. The data is updated every 3 minutes.

Data and Resources

Additional Info

Field Value
Unit MW
Data period 3 min
Contact person Jesper Grönlund (jesper.gronlund@fingrid.fi)