Peak load power - real time data

Activated peak load power based on the real-time measurements in Fingrid's operation control system including peak load reserve activations and trial runs during winter period. The data is updated every 3 minutes.

Data and Resources

Additional Info

Field Value
Unit MW
Data period 3 min
Contact person erno.paananen@fingrid.fi