43 datasets found

Formats: CSV Groups: Rajakapasiteetit ja siirrot

Filter Results
  • Measured transmission of electricity in Finland from north to south

    Measured electricity flow in North-South cut in Finland (cut P1). In the graph flow from North to South is positive.

  • Transmission of electricity between Finland and Russia - measured hourly data

    Measured electrical transmission between Finland and Russia. Positive sign means transmission from Finland to Russia. Negative sign means transmission from Russia to Finland.

    The value is updated once every hour after the hour shift. Each day before noon the values of the previous day are updated with more accurate measurement values.

  • Transmission of electricity between Finland and Central Sweden - measured hou...

    Measured electrical transmission between Finland and Central Sweden (SE3) high voltage direct current tie lines. Positive sign means transmission from Finland to Central Sweden (SE3). Negative sign means transmission from Central Sweden (SE3) to Finland.

    The value is updated once every hour after the hour shift. Each day before noon the values of the previous day are updated with more accurate measurement values.

  • Transmission of electricity between Finland and Estonia - measured hourly data

    Measured electrical transmission between Finland and Estonia HVDC tile lines (Estlink 1 and Estlink 2). Positive sign means transmission from Finland to Estonia. Negative sign means transmission from Estonia to Finland.

    The value is updated once every hour after the hour shift. Each day before noon the values of the previous day are updated with more accurate measurement values.

  • Transmission of electricity between Finland and Northern Sweden - measured ho...

    Measured transmission of electricity between Finland and Northern Sweden (SE1). Positive sign means transmission from Finland to Northern Sweden (SE1). Negative sign means transmission from Northern Sweden (SE1) to Finland.

    The value is updated once every hour after the hour shift. Each day before noon the values of the previous day are updated with more accurate measurement values.

  • Transmission of electricity between Finland and Norway - measured hourly data

    Measured electrical transmission between Finland and Norway 220kV tie line. Positive sign means transmission from Finland to Norway. Negative sign means transmission from Norway to Finland.

    The value is updated once every hour after the hour shift. Each day before noon the values of the previous day are updated with more accurate measurement values.

  • Planned weekly capacity from south to north

    Planned weekly capacity on North-South cut in Finland (cut P1) from South to North. Planned outages are included in the weekly capacity, information is not updated after disturbances.

  • Planned weekly capacity from north to south

    Planned weekly capacity on North-South cut in Finland (cut P1) from North to South. Planned outages are included in the weekly capacity, information is not updated after disturbances.

  • Day-ahead transmission capacity SE1-FI – official

    Day-ahead transmission capacity from North-Sweden (SE1) to Finland (FI). Transmission capacity is given hourly for every hour of the next day. Each hour is given one value. Day-ahead transmission capacity Fingrid will publish every day in the afternoon. This capacity will not changed after publication. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Day-ahead transmission capacity SE3-FI – official

    Day-ahead transmission capacity from Central-Sweden (SE3) to Finland (FI). Transmission capacity is given hourly for every hour of the next day. Each hour is given one value. Day-ahead transmission capacity Fingrid will publish every day in the afternoon. This capacity will not changed after publication. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Day-ahead transmission capacity FI-SE3 – official

    Day-ahead transmission capacity from Finland (FI) to Central-Sweden (SE3). Transmission capacity is given hourly for every hour of the next day. Each hour is given one value. Day-ahead transmission capacity Fingrid will publish every day in the afternoon. This capacity will not changed after publication. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Day-ahead transmission capacity FI-SE1 – official

    Day-ahead transmission capacity from Finland (FI) to North-Sweden (SE1). Transmission capacity is given hourly for every hour of the next day. Each hour is given one value. Day-ahead transmission capacity Fingrid will publish every day in the afternoon. This capacity will not changed after publication. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Day-ahead transmission capacity EE-FI – official

    Day-ahead transmission capacity from Estonia (EE) to Finland (FI). Transmission capacity is given hourly for every hour of the next day. Each hour is given one value. Day-ahead transmission capacity Fingrid will publish every day in the afternoon. This capacity will not changed after publication. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Day-ahead transmission capacity FI-EE – official

    Day-ahead transmission capacity from Finland (FI) to Estonia (EE). Transmission capacity is given hourly for every hour of the next day. Each hour is given one value. Day-ahead transmission capacity Fingrid will publish every day in the afternoon. This capacity will not changed after publication. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Day-ahead transmission capacity FI-SE1 – planned

    Planned day-ahead transmission capacity from Finland (FI) to North-Sweden (SE1). Transmission capacity is given hourly for every next week hour. Each week's hour is given one value. Planned weekly transmission capacity Fingrid will publish every Tuesday. Information will be updated if there are changes to the previous plan timetable or capacity. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Day-ahead transmission capacity SE3-FI – planned

    Planned day-ahead transmission capacity from Central-Sweden (SE3) to Finland (FI). Transmission capacity is given hourly for every next week hour. Each week's hour is given one value. Planned weekly transmission capacity Fingrid will publish every Tuesday. Information will be updated if there are changes to the previous plan timetable or capacity. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Day-ahead transmission capacity SE1-FI – planned

    Planned day-ahead transmission capacity from North-Sweden (SE1) to Finland (FI). Transmission capacity is given hourly for every next week hour. Each week's hour is given one value. Planned weekly transmission capacity Fingrid will publish every Tuesday. Information will be updated if there are changes to the previous plan timetable or capacity. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Day-ahead transmission capacity FI-SE3 – planned

    Planned day-ahead transmission capacity from Finland (FI) to Central-Sweden (SE3). Transmission capacity is given hourly for every next week hour. Each week's hour is given one value. Planned weekly transmission capacity Fingrid will publish every Tuesday. Information will be updated if there are changes to the previous plan timetable or capacity. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Stock exchange trade FI-RUS-FI

    Direct trade volumes derive from freely placed bids in the Nordic day-ahead (Elspot) and intraday (Elbas) electricity markets. Information is updated once the day-ahead market results are public. Information on the intraday trade is updated before the operational hour.

  • Stock exchange capacity FI-RUS

    The capacity on the 400 kV connection from Finland to Russia is reserved to direct trade of the following commercial day. Fingrid and the Russian parties, who have jointly agreed that the capacity is 140 MW in both directions, daily confirm the capacity.

You can also access this registry using the API (see API Docs).