18 datasets found

None: Venäjä Tags: Russia Formats: CSV

Filter Results
  • Transmission between Finland and Russia - real time data

    Power transmission between Finland and Russia based on the real-time measurements in Fingrid's operation control system. Positive sign means transmission from Finland to Russia. Negative sign means transmission from Russia to Finland. The data is updated every 3 minutes.

  • Transmission of electricity between Finland and Russia - measured hourly data

    Measured electrical transmission between Finland and Russia. Positive sign means transmission from Finland to Russia. Negative sign means transmission from Russia to Finland.

    The value is updated once every hour after the hour shift. Each day before noon the values of the previous day are updated with more accurate measurement values.

  • Stock exchange trade FI-RUS-FI

    Direct trade volumes derive from freely placed bids in the Nordic day-ahead (Elspot) and intraday (Elbas) electricity markets. Information is updated once the day-ahead market results are public. Information on the intraday trade is updated before the operational hour.

  • Stock exchange capacity FI-RUS

    The capacity on the 400 kV connection from Finland to Russia is reserved to direct trade of the following commercial day. Fingrid and the Russian parties, who have jointly agreed that the capacity is 140 MW in both directions, daily confirm the capacity.

  • Stock exchange capacity RUS-FI

    The capacity on the 400 kV connection from Russia to Finland is reserved to direct trade of the following commercial day. Fingrid and the Russian parties, who have jointly agreed that the capacity is 140 MW in both directions, daily confirm the capacity.

  • Transmission capacity RUS-FI

    The total commercial transmission capacity of the 400 kV transmission lines from Russia to Finland owned by Fingrid. The technical capacity on 400 kV lines from Russia to Finland is 1400 MW or 1000 MW, depending whether the NWPP power plant that is located in St. Petersburg area is connected to the Finnish or the Russian power system. Fingrid has reserved 100 MW of transmission capacity from Russia to Finland to buy reserve power. The technical maximum capacity from Finland to Russia is 350 MW, of which Fingrid has reserved 30 MW to buy reserve power.

  • Transmission capacity FI-RUS

    The total commercial transmission capacity of the 400 kV transmission lines from Finland to Russia owned by Fingrid. The technical capacity on 400 kV lines from Russia to Finland is 1400 MW or 1000 MW, depending whether the NWPP power plant that is located in St. Petersburg area is connected to the Finnish or the Russian power system. Fingrid has reserved 100 MW of transmission capacity from Russia to Finland to buy reserve power. The technical maximum capacity from Finland to Russia is 350 MW, of which Fingrid has reserved 30 MW to buy reserve power.

  • Planned transmission capacity RUS-FI

    Planned transmission capacity from Russia to Finland. Transmission capacity is given hourly for every next week hour. Each week's hour is given one value. Planned weekly transmission capacity Fingrid will publish every Tuesday. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Planned transmission capacity FI-RUS

    Planned transmission capacity from Finland to Russia. Transmission capacity is given hourly for every next week hour. Each week's hour is given one value. Planned weekly transmission capacity Fingrid will publish every Tuesday. Transmission capacity mean the capability of the electricity system to supply electricity to the market without compromising the system security.

  • Bilateral trade capacity RUS-FI, unused

    Unused bilateral trade capacity From Russia (RUS) to Finland (FI). The capacity of electricity transmission in bilateral trade can be left unused if the parties do not import the maximum amount of electricity to Finland.

  • Bilateral trade capacity FI-RUS, unused

    Unused bilateral trade capacity from Finland (FI) to Russia (RUS). The capacity of electricity transmission in bilateral trade can be left unused if the parties do not export the maximum amount of electricity to Russia.

  • Bilateral trade capacity RUS-FI

    The bilateral capacity on the 400 kV connection from Russia (RUS) to Finland (FI) that is reserved to bilateral trade of the following commercial day. The capacity is confirmed by Fingrid and the Russian parties.

  • Bilateral trade capacity FI-RUS

    The bilateral capacity on the 400 kV connection from Russia to Finland that is reserved to bilateral trade of the following commercial day. The capacity is confirmed by Fingrid and the Russian parties.

  • Bilateral trade between FI-RUS

    Bilateral trade between Finland and Russia. Fingrid and the Russian parties confirm the bilateral trades on 400 kV cross-border connection in the morning of the commercial day D for the following commercial day D+1. The confirmed bilateral trades will be bid price-independently on the electricity spot market

  • Intraday transmission capacity RUS-FI

    The capacity given to intraday market means transfer capacity after day-ahead trade from Russia to Finland. The intraday capacity between Finland and Russia is updated once a day. The data will not be revised after hourly day-ahead trade.

  • Intraday transmission capacity FI-RUS

    The capacity given to intraday market means transfer capacity after day-ahead trade from Finland (FI) to Russia (RUS). The indraday capacity between Finland and Russia is updated once a day. The data will not be revised after hourly day-ahead trade.

  • Cross-border transmission fee, import from Russia

    Hourly cross-border transmission fee (dynamic tariff) for imports from Russia on Fingrid's connections.

  • Cross-border transmission fee, export to Russia

    Hourly cross-border transmission fee (dynamic tariff) for exports to Russia on Fingrid's connections.

You can also access this registry using the API (see API Docs).