171 datasets found

Organizations: Fingrid Licenses: Creative Commons Attribution Formats: CSV

Filter Results
  • Balancing Capacity (mFRR), hourly market, procurement from Estonia

    Data before 30.11.2022 is test-data.

    In addition to the national weekly market, Fingrid also has the possibility to procure mFRR balancing capacity from Estonia. This dataset includes the procured balancing capacity amounts from Estonia, MW/week. The procured amount is published at latest on Friday of the week before the procurement week at 12:00 (EET).

  • Balancing Capacity (mFRR), down, hourly market, bids

    Data before 30.11.2022 is test-data.

    The amount of downwards balancing capacity bids in the balancing capacity market, MW/h. Fingrid procures mFRR capacity through the balancing capacity market, which is held when needed. Balance service provider pledges itself to leave regulating bids on the regulation market. For that the balance service provider is entitled to capacity payment.

  • Balancing Capacity (mFRR), up, hourly market, bids

    Data before 30.11.2022 is test-data.

    The amount of upwards balancing capacity bids in the balancing capacity market, MW/h. Fingrid procures mFRR capacity through the balancing capacity market, which is held when needed. Balance service provider pledges itself to leave regulating bids on the regulation market. For that the balance service provider is entitled to capacity payment.

  • Balancing Capacity (mFRR), down, hourly market, price

    Data before 30.11.2022 is test-data.

    The marginal price of downwards balancing capacity procured from the balancing capacity market, €/MW,h. Fingrid procures mFRR capacity through the balancing capacity market auction, which is held when needed. Balance service provider pledges itself to leave regulating bids on the regulation market. For that the balance service provider is entitled to capacity payment.

  • Balancing Capacity (mFRR), up, hourly market, procurement forecast

    Data before 30.11.2022 is test-data.

    The forecasted amount of upwards balancing capacity procurement [MW/h].

    Fingrid procures mFRR capacity through the balancing capacity market, which is held when needed. Balance service provider pledges itself to leave regulating bids on the regulation market. For that the balance service provider is entitled to capacity payment.

  • Balancing Capacity Market (mFRR), up, hourly market, price

    Data before 30.11.2022 is test-data.

    The marginal price of upwards balancing capacity procured from the balancing capacity market, €/MW,h. Fingrid procures mFRR capacity through the balancing capacity market auction, which is held when needed. Balance service provider pledges itself to leave regulating bids on the regulation market. For that the balance service provider is entitled to capacity payment.

  • Balancing Capacity (mFRR), down, hourly market, procurement forecast

    Data before 30.11.2022 is test-data.

    The forecasted amount of downwards balancing capacity procurement [MW/h].

    Fingrid procures mFRR capacity through the balancing capacity market, which is held when needed. Balance service provider pledges itself to leave regulating bids on the regulation market. For that the balance service provider is entitled to capacity payment.

  • Balancing Capacity (mFRR), down, hourly market, procured volume

    Data before 30.11.2022 is test-data.

    The amount of downwards balancing capacity procured from the balancing capacity market, MW/h. Fingrid procures mFRR capacity through the balancing capacity market auction, which is held when needed. Balance service provider pledges itself to leave regulating bids on the regulation market. For that the balance service provider is entitled to capacity payment.

  • Frequency containment reserves for disturbances upwards regulation, hourly ma...

    Hourly prices (€/MW,h) of procured frequency containment reserve for disturbances upwards regulation (FCR-D up) in Finnish hourly market for each CET-timezone day is published previous evening at 22:45 (EET).

    FCR-D (up) is the frequency containment reserve used in the Nordic synchronous system that aims to keep the frequency above 49,5 Hz during disturbances.

    Hourly market is a reserve market operated by Fingrid. Procured volumes vary for each hour and price is the price of the most expensive procured bid.

  • Frequency containment reserve for disturbances upwards regulation, procured v...

    Hourly volume of procured frequency containment reserve for disturbances upwards regulation (FCR-D up) in Finnish hourly market for each CET-timezone day is published previous evening at 22:45 (EET).

    FCR-D (up) is the frequency containment reserve used in the Nordic synchronous system that aims to keep the frequency above 49,5 Hz during disturbances.

    Hourly market is a reserve market operated by Fingrid. Procured volumes vary for each hour and price is the price of the most expensive procured bid.

  • Frequency Containment Reserve for Normal operation, hourly market volumes

    Hourly volume of procured frequency containment reserve for normal operation (FCR-N) in Finnish hourly market for each CET-timezone day is published previous evening at 22:45 (EET).

    FCR-N is the frequency containment reserve used in the Nordic synchronous system that aims to keep the frequency in normal frequency range between 49,9 - 50,1 Hz.

    Hourly market is a reserve market operated by Fingrid. Procured volumes vary for each hour and price is the price of the most expensive procured bid.

  • Frequency Containment Reserve for Normal operation, hourly market prices

    Hourly prices (€/MW,h) of procured frequency containment reserve for normal operation (FCR-N) in Finnish hourly market for each CET-timezone day is published previous evening at 22:45 (EET).

    FCR-N is the frequency containment reserve used in the Nordic synchronous system that aims to keep the frequency in normal frequency range between 49,9 - 50,1 Hz.

    Hourly market is a reserve market operated by Fingrid. Procured volumes vary for each hour and price is the price of the most expensive procured bid.

  • Power system state - real time data

    Different states of the power system - traffic lights: 1=green, 2=yellow, 3=red, 4=black, 5=blue

    • Green: Power system is in normal secure state.
    • Yellow: Power system is in endangered state. The adequacy of the electricity is endangered or the power system doesn't fulfill the security standards.
    • Red: Power system is in disturbed state. Load shedding has happened in order to keep the adequacy and security of the power system or there is a remarkable risk to a wide black out.
    • Black: An extremely serious disturbance or a wide black out in Finland.
    • Blue: The network is being restored after an extremely serious disturbance or a wide blackout.

    The data is updated every 3 minutes.

  • Balancing Capacity Market, procurement from Elering

    In addition to the national weekly market, Fingrid also has the possibility to procure mFRR balancing capacity from Estonia. This dataset includes the procured balancing capacity amounts from Estonia, MW/week. The procured amount is published at latest on Friday of the week before the procurement week at 12:00 (EET).

  • Wind power generation - hourly data

    Finnish hourly wind power generation is a sum of measurements from wind parks supplied to Fingrid and of the estimate Fingrid makes from non-measured wind parks. Non-measured wind parks are about two percent of the production capacity.

  • Wind power production - real time data

    Wind power production based on the real-time measurements in Fingrid's operation control system. About two percent of the production capacity is estimated as measurements aren't available. The data is updated every 3 minutes.

  • Electricity consumption in Finland - real time data

    Electricity consumption in Finland is calculated based on production and import/export. The data is updated every 3 minutes.

    Production information and import/export are based on the real-time measurements in Fingrid's operation control system.

  • Peak load power - real time data

    Activated peak load power based on the real-time measurements in Fingrid's operation control system including peak load reserve activations and trial runs during winter period. The data is updated every 3 minutes.

  • Net import/export of electricity - real time data

    Net import to Finland and net export from Finland. The data is updated every 3 minutes.

    Production information and import/export are based on the real-time measurements in Fingrid's operation control system.

  • Industrial cogeneration - real time data

    Cogeneration of industry based on the real-time measurements in Fingrid's operation control system. The data is updated every 3 minutes.

    Cogeneration means power plants that produce both electricity and district heating or process steam (combined heat and power, CHP).

You can also access this registry using the API (see API Docs).